THK is excited to team up with the Fountain Creek Flood Control and Greenway District, Matrix Design Group, Sun Construction and Total Terrain to design and construct the 6,200 LF of Creek improvements through Barr Farm. To see the exciting work the District is doing in the Fountain Creek watershed, please visit http://www.fountain-crk.org/ .