Steelworks Park

THK was retained by the Bessemer Historical Society to develop a conceptual plan for the placement of several Steel Mill artifacts west of, and adjacent to, I-25 on the north side of the former CF&I Dispensary building.  THK developed a conceptual plan that focused on creating visibility of the large artifacts on display to travelers on I-25, improving visibility and circulation to the main museum door entrance, and incorporating circulation to and around the existing Mine Rescue Car.  The concept also focused on pedestrian spaces, interpretive opportunities, xeric landscape practices and the display and reuse of historic elements.

Following the development and approval of the concept design, THK was again retained to complete construction documentation and cost estimating for the construction of the Steelworks Park.  During the construction document phase, THK worked closely with the Historical Society Board of Directors and Staff as well as the Colorado Department of Transportation (CDOT). This project was required to undertake a CDOT review because funding for the park construction was obtained through an Intergovernmental Agreement.  To date, all required clearances have been obtained.

THK and the Historical Society also worked closely with the City of Pueblo to meet City development objectives.  The Construction documents and specifications were completed on time and on budget.  THK developed all bid documents and has assisted the Bessemer Historical Society in Bid Administration and CDOT coordination.  The project was completed in fall of 2017.

Client

Bessemer Historical Society

Location

Bessemer, CO

Services

Construction Observation
Conceptual Planning
Bidding Administration

Related Projects

McCain Open Space

McCain Open Space

STRATEGIC GOAL #1: CONSERVATION

Throughout the entire development of the McCain Open Space Master Plan our design team set out to balance public access to the space, with the health of the existing environment and ecology. Through our mapping of the existing Blue River floodplain and associated wetlands in addition to the existing wildlife habitat and sensitive ecological areas and our extensive public engagement process, it became apparent that there was a significant preference for minimizing hard surfaces, not constructing any built structures, and providing controlled access to the Blue River in a way that ensures the long-term success and survival of this valuable natural system.

STRATEGIC GOAL #2: RECREATION

The wetlands and wildlife habitat within McCain Open Space are the critical features of the site. Preserving and improving the breadth and quality of this ecosystem in addition to creating valuable recreation opportunities was the primary focus of this Master Plan. The Master Plan is able to achieve this by utilizing existing disturbance corridors whenever possible and ensuring that habitat and ecological impacts are minimized.

The hierarchical trail system developed throughout this planning process was designed to help reduce erosion and improve safety for all visitors and residents while providing a sustainable balance between the
health of the ecosystems and the demand for recreation by minimizing user conflict, and dispersing the users for whom it will serve across a series of trails and trail loops designed with the diverse skill levels and accessibility needs of those users in mind.

Aligning with the goal of conservation, the proposed higher-use loop trails are concentrated within the central core and along with the alignment of McCain Road to ensure that these more heavily used trails will be in close proximity to other areas that already have high levels of existing human disturbance, thus allowing the creation of proposed feature areas in places that minimize the impact on the more sensitive parts of the ecosystem, such as the riverbanks.

Within the open space there are nearly twenty unique ecosystems, comprised of indigenous plant communities, and wetland features from grasslands, to meadows, to riparian corridors. The final design of the open space offers an opportunity for users of the space to experience the beauty of these ecosystems, while respecting the sensitive nature of these natural areas.

STRATEGIC GOAL #3: ACCESS AND INCLUSION

Removing all barriers to access is key for conservation and recreation efforts and improvements being fully realized and reaching their greatest potential. As an Open Space operated by the Town of Breckenridge,
it was paramount that any development of McCain catered to the diverse demographics of the Town while also incorporating the desires of tourists who fuel the Town’s economy.

Consequently, our plan minimizes barriers to access in multiple regards: physically, by facilitating traversal through the open space through the planned ADA-compliant trails, loops, and river access points; and educationally or informatively, through the proposed suggestions for on-site signage and the publication of materials on-site and online in a variety of methods and languages.

STRATEGIC GOAL #4: STEWARDSHIP

All proposed trails were designed to minimize environmental impacts and ongoing maintenance requirements, which was achieved in part by ensuring trail corridors remained out of the floodplain whenever possible, and stayed clear of sensitive parts of the Blue River susceptible to erosion such as the cut banks.

Another important component of this Master Plan is to understand and plan for potential wildfire re hazards and the impact to neighbors of the open space, by monitoring the overall health of on-site vegetation through continuing study and inventory of ecosystem health, and identification of invasive and noxious weeds today and long into the future through the utilization of a site specific c stewardship program that can evolve with the Open Space over time.

All restoration and enhancement efforts took into consideration the historical context and resources in the area, to protect, maintain, and enhance ecological values and services. ERO Resources recommendations regarding targeted conditions, standards, and goals that are specific to each ecological habitat type and innovative design techniques for rainwater capture and stormwater management shall be integrated during future design phases to further support a sustainable and regenerative ecosystem model for open space.